Telecom DC Power and UPS Service for Carrier Facilities

MCS services DC plant, rectifiers, battery strings and generators for central offices, huts, cell sites and carrier facilities, with a technician onsite in 1 to 4 hours.

DC plant, rectifiers and battery strings - the part of telecom nobody visits

Network infrastructure fails quietly. A rectifier in alarm, a string with two open cells, a cabinet fan that stopped in July - none of it interrupts service until the utility drops, at which point the reserve you assumed you had turns out to have been notional for months.
MCS maintains DC power plant, UPS systems, standby generation and thermal across central offices, huts, cell sites and carrier facilities.

AC and DC, on one programme

Telecom is the one sector where the critical load usually isn't on AC at all. The transmission equipment sits on a DC bus, backed by a battery string, fed by rectifiers, with the AC UPS protecting the ancillary and IT loads around it.
That means two distinct maintenance disciplines, usually held by two different vendors, with the interface between them owned by nobody. We hold both.

Reserve time is a measurement, not a specification

The single most common finding on telecom battery plant is that reserve time was calculated once, at design, against a load that has since grown. Every equipment addition since then has eroded it, and nothing recalculated it.
We measure the actual load, test the actual string, and report the actual reserve - which is a different number from the one in the drawing on the wall, often by hours.

Distributed sites, unattended, and hard to get to

The economics of a network estate are unforgiving: hundreds of small sites, each individually low-value and collectively critical, most of them unstaffed. Windshield time dominates cost, and a truck roll for a fault that a scheduled visit would have caught is the most expensive way to run a network.
We programme the estate on a route basis, standardise the battery replacement cycle so it becomes a capital line rather than a recurring surprise, and use the risk grading from the Predictive Failure Analysis to decide which sites get visited more often than the schedule says.

Telecom power questions

Do you service -48 VDC power plant as well as AC UPS?

Yes - rectifier modules and controllers, DC distribution and fusing, bus connections, battery strings and the alarm and monitoring systems around them, alongside the AC UPS protecting ancillary loads. Holding both sides on one programme removes the interface gap that normally sits between two vendors.

By testing it. Reserve is almost always calculated once at design and never revisited, while the load grows with every equipment addition. We measure the actual load, test the actual string, and report the actual reserve - which is routinely far below the figure on the drawing.

Yes, on a route-based programme across the estate. Distributed unattended sites fail invisibly, so the schedule and the risk grading matter more than the individual visit.

Yes. Telecom generators are frequently light-loaded, which causes wet stacking and carbon build-up and leaves the set unable to deliver rated output when it's actually needed. Load bank testing is the only way to prove capacity.

A Field Service Technician replies within 15 minutes and is onsite within one to four hours, 24/7/365.