When the emergency is the region
Most critical power planning assumes a localised failure - your building loses utility power while everything around it stays normal. Public sector continuity assumes the opposite: a wildfire, a public safety power shutoff, a seismic event or a multi-day regional outage in which your emergency operations centre, dispatch floor or shelter site is one of the few things still expected to work.
That changes the engineering. Fuel autonomy stops being a nameplate figure and becomes a resupply question. Generator run hours stop being an annual exercise total and become a sustained-operation figure. And the assets you never test under real load are exactly the ones that will be discovered during the event.
Where we work in the public sector
What we maintain
Critical power (UPS plant, battery systems, DC systems, static switches, distribution), generator (sets, transfer switches, fuel systems, load bank testing), and thermal (CRAC, chilled water, condensers) - vendor agnostic across nineteen manufacturers, with no subcontractors on any job.