The boundary is where failures live
The base building owns the generator, the transfer switches, the fire pump, elevator recall and egress lighting. The tenant owns the UPS in their server room and the equipment behind it. Both parties reasonably assume the other side is maintained.
Neither party owns the question that actually matters: when utility supply drops, does the tenant's UPS ride through long enough for the base building generator to pick up - and has anyone tested that sequence end to end since the tenant moved in?
We hold both sides, or we hold one side and document the other honestly, so the interface stops being a blind spot.
Portfolios, not buildings
Property management teams don't have a critical power problem in one building. They have twenty buildings with twenty different vendors, twenty different service intervals and no consolidated view of where the risk actually is.
We standardise the programme across the portfolio: one point of contact, one reporting format, asset-level risk grading in every building, and a battery replacement cycle synchronised across the estate so capital planning becomes a schedule rather than a queue of emergencies competing for the same reserve.
That consolidated view is also what makes the capital conversation possible. A written Predictive Failure Analysis per building, with high, medium and low risk graded per asset, is the document that gets a battery replacement approved before the failure rather than after it.
Where we work
What we maintain
Critical power (UPS, battery plant, static switches, DC systems, PDUs and distribution), generator (sets, transfer switches, fuel systems, load bank testing) and thermal (CRAC, chilled water, condensers, server room cooling) - vendor agnostic across nineteen manufacturers, with all CAD and electrical diagram work done in-house and no subcontractors on any job.
Hospitality and gaming carry an additional constraint most commercial work doesn't: there is no closed period. Maintenance is planned around continuous occupancy and continuous operation rather than around an overnight window that doesn't exist.